PM-KUSUM: Solar Pump Scheme Status in 2026

PM-KUSUM supports agricultural solar plants and pumps; MNRE lists the scheme period through 31 March 2026, so verify any later extension before applying.

What PM-KUSUM was designed to support

The Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyaan (PM-KUSUM) is a Ministry of New and Renewable Energy (MNRE) programme intended to expand decentralised solar power and solarise agricultural pumps and feeders. It is distinct from PM Surya Ghar, which focuses on residential rooftop solar systems.

The three components

  • Component A: Decentralised grid-connected renewable power plants, including solar plants in the capacity range described by the MNRE scheme page.
  • Component B: Stand-alone solar agricultural pumps.
  • Component C: Solarisation of grid-connected agricultural pumps and feeder-level solarisation.

The MNRE page describes targets for solar capacity, stand-alone pumps and grid-connected pump solarisation. Actual project availability depends on the State/UT implementing agency, DISCOM, notified capacity, tender and the relevant component.

Important scheme-period status as of 14 November 2026

The current MNRE scheme page lists the PM-KUSUM period as running till 31 March 2026. The page’s stated period has therefore passed. Do not assume that a new application window, subsidy or allocation remains open in November 2026 unless MNRE or the State implementing agency has issued a later extension or fresh notification. Check the official page and current State/UT notices before spending money or submitting an application.

How to check whether a component is available in your State

  1. Open the official MNRE PM-KUSUM page and read the latest scheme-period and guideline information.
  2. Identify whether the proposal relates to Component A, B or C; the implementing route is not identical for all components.
  3. Check the State Renewable Energy Development Agency and the relevant DISCOM for current tenders, allocations and application notices.
  4. Confirm whether the notice is for farmers, farmer groups, cooperatives, panchayats, FPOs, water-user associations or another eligible participant category.
  5. Read the tender or application document for technical specifications, land/pump conditions, grid connection, payment and selection rules.
  6. Use only the official application portal or notified implementing agency. Keep the acknowledgement and all payment receipts.

Documents and project information to prepare

The required documents depend on the component and State notification. A farmer may need land or pump records, electricity connection details, identity and bank information, site details and any technical documents requested by the implementing agency. For a power plant proposal, the project structure, site and grid-connection conditions may be different. This is a preparation list, not a universal mandatory-document checklist.

Do not assume a fixed subsidy or open application

Assistance levels, beneficiary contribution, financing, technical specifications and application windows depend on the component and current guidelines. Avoid using old social-media posters or agent promises as proof of a live subsidy. Never transfer money to a personal bank account for a supposed PM-KUSUM approval. Verify the agency, tender number and payment route directly with MNRE or the State nodal agency.

PM-KUSUM vs PM Surya Ghar

PM-KUSUM is an agriculture-focused programme for decentralised solar power, stand-alone agricultural pumps and solarisation of grid-connected pumps/feeders. PM Surya Ghar is a separate residential rooftop-solar programme. A household rooftop application should not be filed under PM-KUSUM, and a farm pump project should not be assumed to qualify under PM Surya Ghar.

Frequently asked questions

Is PM-KUSUM open for new applications in November 2026?
The MNRE page currently lists the scheme period till 31 March 2026. Check for a later official extension or State notification; do not assume that applications are open.

Does every farmer receive a solar pump subsidy?
No. Component, State allocation, technical eligibility and selection conditions apply.

Is PM-KUSUM the same as PM Surya Ghar?
No. They are separate programmes with different target users and project types.

Official sources and related MANAINFO guides

Last reviewed: 14 November 2026. The scheme period and application status are time-sensitive. Use the latest MNRE and State implementing-agency notification.