Telangana ePanchayat – Gram Panchayat Services Guide is a practical reference for citizens and MeeSeva operators. Find the documents, application steps, indicative fees and Citizen Service Charter timelines for common Gram Panchayat services. Applications and approvals are handled by the concerned Gram Panchayat and competent technical authority under applicable rules.
Quick Service Directory
- Property Tax – New Assessment / Re-assessment
- House / Building Property Mutation
- Trade Licence – Fresh / Renewal
- Building Construction Permission
- Layout Permission
- Other Gram Panchayat Citizen Services and timelines
1. Property Tax – Assessment / Re-assessment
Purpose: Assessment of tax for a new house/building or re-assessment of an existing property.
Documents for new assessment (as listed in the supplied application):
- ID proof / address proof.
- Building permission with sanctioned plan.
- Occupancy certificate copy.
- Present market value certificate.
Documents for re-assessment:
- Copy of sanctioned plan.
- Up-to-date property tax paid receipt.
- Present market value certificate.
Application details: The supplied Self Assessment Application asks for applicant details, mobile number, address, house/building location, plot area, construction status, property type, existing assessment number (for re-assessment), building permission number/date, completion date, roof type and floor-wise plinth area. The applicant signs the declaration and submits the enclosures to the Panchayat Secretary / through the available online workflow.
Process: The supplied procedure says new house tax can be self-assessed through the portal; the request is sent to the concerned Executive Authority for verification and confirmation. After confirmation, tax can be paid through the available collection mode, including MeeSeva. Existing property tax can be viewed by citizens; the supplied document also mentions door-to-door collection and software entry.
Tax calculation note from the supplied PDF: It describes a Capital Value Method using land value and construction value, with depreciation on construction. Its sample adds 8% Library Cess after calculating house tax; water supply, sanitation and street-lighting user charges may also be added as per Gram Panchayat resolutions. Actual assessment depends on the applicable local values and resolution.
Citizen Charter timeline: 15 days for Assessment of Property Tax. The supplied documents do not specify a fixed application fee for this service; check the portal / Gram Panchayat for the current payable amount.
2. House / Building Property Mutation
Purpose: Transfer of the Gram Panchayat house/building property record to a new owner after a registered transfer or inheritance.
When to apply: The supplied procedure says an application should be made within three months after registration of the transfer instrument. In the event of the owner’s death, heirs may apply within the period stated in that procedure.
Documents:
- ID proof / address proof.
- Registered transfer document (sale deed, partition deed, gift deed, will deed or settlement deed) with link document; or title deed establishing ownership.
- For inheritance: death certificate and applicable succession certificate / legal-heir certificate / court decree or other title evidence.
- Latest Encumbrance Certificate (EC).
- Up-to-date property tax receipt.
- Building permission.
- Present market value certificate if registration is more than three months old, as stated in the supplied checklist.
Application details: The supplied Mutation Application asks for applicant and previous-owner details, registration district and SRO, document number/date, transfer document type, inheritance details if relevant, property/house/survey/plot and assessment numbers, plot and plinth areas, and existing/new boundaries.
Process: Submit the mutation application online with the supporting documents. The concerned Executive Authority verifies the application and sanctions or rejects it under the applicable rules. Keep the online application number for follow-up.
Fee note: The supplied PDF says no mutation fee is prescribed generally. If the Gram Panchayat resolves to levy a fee, it states a ceiling of 0.1% of registered document value for registered transfers, or 0.1% of market value for mutation based on Will / Succession / Legal-heir documents, with the latest market value certificate. Confirm the current Gram Panchayat resolution before payment.
Citizen Charter timeline: 15 days.
3. Trade Licence – Fresh / Renewal
Purpose: Licence issued by the local authority to conduct specified businesses/trades within the Gram Panchayat jurisdiction. The supplied information distinguishes general trades from Dangerous and Offensive (D&O) trades listed under G.O.Ms.No.16, PR&RD (Pts.III), dated 10-01-1996.
Documents for a fresh licence:
- ID proof / address proof.
- Rental deed / lease deed, where the premises are rented or leased.
- Up-to-date property tax receipt.
- For business identity, the application form has fields for firm/shop name, trade and sub-trade, premises address, ownership/tenancy, other department licence requirement and TAN/GST number if available.
Documents for renewal:
- Up-to-date property tax receipt.
- Previous year’s trade licence fee paid receipt.
Application process: Fill the Fresh / Renewal Trade Licence Application addressed to the Panchayat Secretary. Give the trade category, business details, premises details and tenancy particulars if applicable. Submit online through the available ePanchayat workflow and pay the fee through the available channel, including MeeSeva as mentioned in the supplied document. The competent Gram Panchayat authority verifies and disposes of the application.
Fees: For general activities/trades, the supplied PDF says rates are as per Gram Panchayat resolutions. D&O trades and power/machinery-related installations may attract the applicable rule-based fees. Cell tower fees shown in the supplied fee document are one-time installation fee of ₹15,000 for ground-based towers and ₹12,000 for roof-top towers, plus annual renewal fee of ₹1,000. These are source-document figures; verify current applicability and local resolutions before payment.
Citizen Charter timeline: 7 days. The Telangana Panchayat Raj Act summary in the supplied government service-delivery report separately states that a licence application is to be disposed of within 15 days under Section 120(3). The Citizen Charter service target and statutory disposal provision are shown separately here; check the applicable case and current instructions.
4. Building Construction Permission
Application: The supplied procedure says applications are submitted online and processed by the concerned Executive Authority. Applications above the Gram Panchayat’s technical purview, including the stated G+2 category, are forwarded to DTCP or UDA where applicable.
Documents listed in the supplied Building Permission PDF:
- Building Application in Annexure-G under G.O.Ms.No.67, PR&RD, dated 26-02-2002, signed by the owner, builder, architect and structural engineer as applicable.
- Ownership document of the site/plot.
- Extract of Master Plan / ZDP.
- Building plans signed by the owner and qualified builder/architect/engineer/surveyor/structural engineer, as applicable.
- Location / topographical plan (scale 1:2000).
- Contour plan where terrain is undulating.
- Site plan (scale 1:500).
- Building elevations and sections (scale not less than 1:100), showing floor-wise use.
- Rainwater harvesting pit plan (scale 1:100).
- Previous sanctioned plan, if an existing building on the site was sanctioned earlier.
- Up-to-date property tax receipt for renovation of an old structure.
- Airport Authority of India NOC, if applicable.
- Telangana State Disaster Response & Fire Services NOC and approved plans, if applicable.
- RDO-issued ORC for Inam lands, wherever necessary.
- Collector NOC for alienation of assigned land to freedom fighters / defence persons, wherever necessary.
- MRO / Collector NOC if the land is recorded as Government land, wherever necessary.
Fees shown in the supplied PDF (Rule 27 table):
- Residential semi-permanent/thatched: ₹50 per structure in the listed UDA / peripheral / major / potential-area category; no minor-GP rate is shown.
- Permanent residential: ₹10 per m² of built-up area, minimum ₹200, in the listed UDA / peripheral / major / potential-area category; ₹2 per m², minimum ₹100, for Minor Gram Panchayats.
- Non-residential: ₹20 per m², minimum ₹1,000, in the listed UDA / peripheral / major / potential-area category; ₹4 per m², minimum ₹200, for Minor Gram Panchayats.
- Renewal of layout/building plan: 20% of total fees in the first category; 10% in Minor Gram Panchayats.
Other charges, penalties and copy charges may apply as per the table and current rules. Confirm the applicable Gram Panchayat category and fee calculation before paying.
Timeline: Citizen Charter: 15 days for building permissions within GP purview and 29 days for permissions beyond GP purview. The Telangana Panchayat Raj Act summary in the government report says GP-purview building permissions are to be sanctioned within 15 days; for other building permissions the GP forwards the application to the Technical Sanction Authority within 7 days, which then has 15 days to decide.
5. Layout Permission
Meaning: The supplied PDF describes a layout as dividing land into building plots and providing roads/streets, footpaths, water supply, drainage, street lighting, open spaces and avenue plantation.
Documents required:
- Layout Application in Annexure-A under G.O.Ms.No.67, PR&RD, dated 26-02-2002, signed by the owner and architect.
- Site plan at a scale not less than 1:1000 showing land details, boundaries, surrounding layouts/lands and existing approach road.
- Layout plan at a scale not less than 1:500 showing land boundaries, plot numbers, dimensions and areas, road/street alignment and widths, and open spaces.
- Prescribed undertaking jointly by the owner and qualified surveyor/engineer for development works.
- Land ownership documents.
- Encumbrance Certificate from the Registration Department.
- Site demarcation certificate from the Assistant Director, Survey and Land Records Department.
- NALA proceedings.
- Statement of arrangements for avenue trees and other enclosures described in Annexure-A, including security deposit / mortgage / bank guarantee and relevant challans where applicable.
Process: Submit the application online. The concerned Executive Authority processes it under the rules. The supplied procedure says applications are forwarded to DTCP or UDA when the Gram Panchayat falls within their jurisdiction. The owner/developer undertakes to provide roads, drains, lighting and other layout amenities to the prescribed standards.
Fees shown in the supplied PDF:
- Layout fee: ₹1 per m², minimum ₹3,000, in the listed UDA / peripheral / major / potential-area category; ₹0.25 per m², minimum ₹1,000, for Minor Gram Panchayats.
- Town Planning inspection and technical scrutiny: ₹100 per acre, minimum ₹1,000, in the listed first category; no Minor GP amount shown.
- Security deposit: ₹2 per m², minimum ₹10,000, in the first category; ₹1 per m², minimum ₹5,000, for Minor Gram Panchayats.
- Renewal: 20% of total fees in the first category; 10% in Minor Gram Panchayats.
Timeline: Citizen Charter: 44 days. The government service-delivery report states that the GP should forward a layout application to the Technical Sanction Authority within 7 days under Section 113(3), and the Technical Sanction Authority should decide within 30 days. These stages explain the statutory processing path; the Citizen Charter lists the overall service target as 44 days.
6. Other Gram Panchayat Citizen Services – Time Limits
The following are the timelines printed in the Telangana Gram Panchayat Citizen Service Charter supplied with the documents. They are service-delivery targets, not a promise that every case will be completed regardless of missing documents or statutory checks.
Taxation
- Assessment of Property Tax – 15 days.
- Building / House Property Mutation – 15 days.
- Appeal against Tax Assessment – 30 days.
- Allotment of Door Number – 7 days.
- Property Value Certificate – 3 days.
Drinking Water
- Water supply connection – 7 days; water pipe leakage – 1 day; hand-pump repair – 3 days.
- Water quantity/regularity complaint – 2 days; water quality complaint – 2 days; drinking water for animals – 7 days.
Sanitation
- Overflowing drain / water stagnation complaint – 3 days.
- Community toilet repair/maintenance – 7 days.
- Waste bin request – 2 days; market hygiene complaint – 3 days.
- Household waste collection/transportation – 1 day.
- Government school/AWC toilet or water-pipeline petty repairs – 15 days.
- Cleaning community rainwater-harvesting structures – 3 days.
Street Lighting and Community Assets
- Non-functional street light complaint – 3 days; new streetlight request – 3 days; High Mast light request – 7 days.
- Burial ground / Vaikuntadhamam improvements – 30 days; public property encroachment complaint – 7 days.
- Playground/public park maintenance – 7 days; Yoga Centre maintenance – 7 days; village road maintenance – 7 days.
Certificates, Licences and Permissions
- Birth / Death / Marriage registration (within 21 days) – 3 days.
- Birth / Death / Marriage certificate issue – 2 days.
- Trade Licence – 7 days; Layout Permission – 44 days.
- Building Permission within GP purview – 15 days; beyond GP purview – 29 days.
Governance, Development, Welfare and Digital Services
- Request to convene Gram Sabha – 10 days; complaint about local institution functioning – 30 days.
- MGNREGA job card – 15 days; MGNREGA work request – 15 days; worksite facilities – 3 days.
- Veterinary care request – 7 days; skill training request – 15 days; school/AWC water, toilets and rainwater-harvesting works – 30 days.
- Forwarding pension applications (old age, widow, disability) – 7 days; sports/cultural programme request – 30 days.
- Forwarding IHHL applications – 7 days; ration-card application forwarding – 7 days.
- Public-place sanitisation request – 1 day; Common Service Centre improvement – 30 days; Panchayat Wi-Fi availability / related complaints – 30 days.
Charter note: The supplied Citizen Charter says Gram Panchayat service hours are 10:30 AM to 5:00 PM and applicants should have no dues payable to the Government or Gram Panchayat.
7. Application Forms and Technical Annexures
- Layout: Annexure-A is the layout application; Annexure-B describes water-bound macadam road specifications; Annexure-I describes qualifications and competence of licensed technical personnel (architect, engineer, surveyor, structural engineer and town planner).
- Building: Annexure-G is the building application form referred to in the supplied building-permission checklist.
- Property Tax: Self Assessment / Re-assessment Application includes applicant, premises, construction, floor-area and enclosure details.
- Mutation: Mutation / Transfer Application includes registration or inheritance details, transferee details, property description and boundaries.
- Trade Licence: Fresh / Renewal Application includes trade type, business, premises, tenancy and other-department licence details.
Use the current forms and annexures made available by the official portal or the concerned Gram Panchayat. The application formats in the source PDFs may be older versions; verify the latest form before submission.
8. Official Links
- ePanchayat – Information and Services
- ePanchayat – Citizen Application Portal
- Gram Panchayat Property Tax Information
- Telangana Panchayat Raj and Rural Development Department
Important: This MANAINFO guide is compiled from the PDFs supplied for this page and the Telangana Gram Panchayat Citizen Service Charter. Fee tables and form references in the supplied PDFs may reflect the version available when those documents were prepared. Fees, portal workflows, eligibility and document requirements can change. Before payment or filing, verify the current amount and checklist on the official ePanchayat portal and with the concerned Gram Panchayat. MANAINFO is an informational guide, not the sanctioning authority.
9. Download Original Forms, Annexures and Fee Documents
Property Tax Assessment
- House Tax Assessment – Procedure, Payment and Tax Calculation (PDF)
- Property Tax Self Assessment / Re-assessment Application Form (PDF)
House / Building Mutation
- Building / House Mutation – Fee Information and Required Documents (PDF)
- Mutation / Transfer of Property Application Form (PDF)
Trade Licence
- Trade Licence – Fees, D&O Trades and Conditions (PDF)
- Fresh / Renewal Trade Licence Application Form (PDF)
Building Permission
Layout Permission
- Layout Permission – Process, Fees and Required Documents (PDF)
- Layout Application – Annexures A to F (PDF)
- Layout / Building Permission – Annexure I: Technical Personnel Qualifications (PDF)
